NPI procurement: 70% of cost is locked before you bid

70% of product cost is decided during design — before procurement sees a spec. Only 12% of manufacturers involve sourcing before a prototype is built. The time to negotiate is before the drawing leaves engineering.
70%
Product cost locked during design
Like setting the price before you shop — once designed, costs are baked in
12%
Engage procurement before prototype
Only 1 in 8 manufacturers calls sourcing early enough
2.03x
Greater savings with early engagement
World-class teams save more than double the average
Common
Engineering delivers a finished spec and procurement runs an RFP — but materials, tolerances, and suppliers were all chosen months ago.
Design decisions lock in 70% of cost
Embedded
Procurement sits inside design reviews, providing should-cost data and supplier options before a single tolerance is finalized.
2.03x greater cost savings
01
Concept review — Procurement provides should-cost estimates and supplier capability data before the first design review. Sets a cost target, not a cost estimate.
02
Supplier mapping — For each major subsystem, procurement identifies 3–5 qualified suppliers with available capacity. No informal nominations from engineering.
03
Design-to-cost — Procurement and engineering run joint value engineering on the top 20% of BOM items by cost. Teardown analysis and alternative materials explored.
04
Prototype sourcing — Competitive bids for prototype builds with pre-negotiated volume pricing that activates at production ramp. Tooling costs are amortized, not sunk.
01
Map your NPI timeline. For your last three product launches, identify when procurement first saw a BOM. If it was after prototype, you have a structural cost leak.
02
Embed one procurement engineer in R&D. Start with the highest-volume product line. Measure how many supplier alternatives were considered during design vs. after.
03
Set design-to-cost targets before engineering begins. Cost is a design input, not an output. Set targets at concept review, jointly by procurement and R&D leadership.
Jargon Decoder
NPI New Product Introduction — the full process of bringing a new product from concept to production.
BOM Bill of Materials — the complete list of parts, components, and materials that go into a product.
Should-cost An estimate of what a part should cost based on materials, labor, and process — not what suppliers charge.
Design-to-cost Setting a cost target before engineering begins so every design choice stays within budget.
DFM Design for Manufacturing — designing parts so they're easy and cheap to manufacture, not just functional.
Tooling The molds, dies, and fixtures needed to mass-produce a part — often the biggest upfront cost.
Sources: Aberdeen Group, McKinsey, CIPS, Hackett Group